Stormwater Modeling in the Real World
See how engineering teams have used VO to support watershed-scale flood planning and long-term stormwater infrastructure decisions.
Watershed Hydrology and Flood Planning
Updating the Humber River Model for Watershed-Scale Flood Planning
Toronto and Region Conservation Authority · Civica Infrastructure Inc.
A detailed VO model helped represent, calibrate and update hydrologic conditions across a 903 km² watershed as land use and planning needs changed.
Read the case study →
Stormwater Planning for Urban Growth
Planning Stormwater Infrastructure for Vaughan’s Emerging Downtown
City of Vaughan · Civica Infrastructure Inc.
VO helped compare pond storage, outlet and service-area scenarios as the Vaughan Metropolitan Centre planned for continued redevelopment.
Read the case study →