The City of Vaughan retained Civica Infrastructure to update the Vaughan Metropolitan Centre’s stormwater servicing strategy as the area planned for continued growth.

Civica Infrastructure
Vaughan Metropolitan Centre context map
Vaughan Metropolitan Centre context. Source: September 2024 project report.
Project owner City of Vaughan
Consultant Civica Infrastructure Inc.
Report date September 2024
VO role Pond routing, storage, release rates and Black Creek flow comparison

The Challenge

The Vaughan Metropolitan Centre is evolving from an industrial area into a high-density downtown. The project team needed to assess existing ponds and future storage requirements while balancing target release rates with limited land available for facilities.

Objectives

Compare future drainage conditions with City and TRCA criteria.
Plan an ultimate system while temporary and private controls remain.
Understand how pond and outlet choices affect releases to Black Creek.
Proposed Vaughan stormwater servicing solutions
Proposed stormwater servicing solutions from the broader study.

How VO Was Used

Civica used VO to represent the existing and proposed stormwater pond network. The model compared outlet and catchment scenarios, routed 2-year through 100-year design storms, estimated storage use and compared releases to Black Creek.

Existing VO hydrologic model schematic
Existing VO model.
Proposed VO hydrologic model schematic
Proposed VO model.

Findings and Decisions Supported

A preferred southeast pond scenario

The report recommended carrying Scenario 5 forward. For the 100-year event, the published analysis reported 19,959 m³ of required storage and a modeled discharge of 1.07 m³/s.

Lower modeled releases to Black Creek

The modeled comparison reported lower proposed-condition flows at selected locations and events.

Selected modeled changes
Location Event Change
West branch 2-year 41% lower
West branch 100-year 30% lower
Main branch 5-year 26% lower
Main branch 100-year 12% lower

Supporting a Long-Term Strategy

The broader study informed a strategy that included retrofits to existing facilities, a new southeast pond, sewer upgrades and transition requirements for development sites.

The associated sewer and overland dual-drainage analysis used another third-party software. Since this project was completed, Smart City Water has added the capability to perform sewer and overland dual-drainage analysis.

VO helped Civica compare storage, outlet and service-area choices before the City advanced a long-term stormwater facility strategy.

Attribution: Project information is summarized from a report prepared by Civica Infrastructure Inc. for the City of Vaughan. Smart City Water supplied the VO software and did not act as the engineering consultant or project owner.