The Challenge
The Humber River watershed is large, urbanizing and hydrologically diverse. TRCA needed an updated watershed model that could reflect current conditions, use available monitoring data and support future flood-planning decisions.
Objectives
How VO Was Used
Civica used VO to build and update a detailed hydrologic representation of the Humber River watershed. The model incorporated hundreds of subcatchments, channel elements and reservoir elements so rainfall-runoff response and watershed routing could be assessed across the system.
Evaluating Future Conditions
The updated model was also used to assess how future land-use conditions could affect peak flows across the watershed. This allowed the project team to compare modeled future conditions against the existing-condition baseline at key locations.
Calibration Grounded in Monitoring Data
Rainfall and streamflow monitoring data were used to support calibration and validation of the watershed model. This provided a measured basis for reviewing how well the model represented observed watershed response.
Supporting Future Flood Planning
A maintained planning asset
The updated Humber River model provided TRCA with a detailed watershed-scale modeling framework that could be maintained and applied as land use, infrastructure and planning needs evolved.